Indian Railway main logo Welcome to Indian Railways
View Content in English
National Emblem of India

हमारे बारे में

परियोजना और प्रतिवेदन

निविदा सूचना

करियर

समाचार और सूचना

सूचना का अधिकार

हमसे संपर्क करें



 
Bookmark Mail this page Print this page
QUICK LINKS
All Active CPP निविदा सूचना
DivisionDepartmentTender Ref. No.Tender Opening DateName Of Work
Railway Board Directorate Civil Engineering HQ/EN/WC/EDAM(EOI)/1/2022/9 Empanelment of eligible Consultants / Firms for undertaking consultancy services for Detailed Project Report (DPR) / Detailed Design Consultancy (DDC) including ROB for the Projects of Indian Railways.
 
Railway Board Directorate Civil Engineering HQ/EN/WC/EDAM(EOI)/2/2022/10 Empanelment of eligible consultants / Firms for undertaking consultancy services for the Project Management Consultancy Services for Indian Railway (IR) Projects.
 
Railway Board Directorate Works HQ/ENWC/EDAM/1/2022 06-05-2022 EOI (Open Ended) for Empanelment of Consultants for Indian Railways for the Consultancy Services for DPR/Detailed Designing/PMC Works.
 
MRVCELECTRICALMRVC-W-304-OHE-KYN-BUD 29-08-2025 Design, Supply, Erection, Testing and Commissioning of 25 kV OHE Works Between Kalyan-Badlapur (Chainage 54800m- 69400m) of Central Railway. In connection with the 3rd & 4th line between Kalyan-Badlapur
 
Document Available
MRVCELECTRICALMRVC/EL/EMU-TRD/wiring Train 16-09-2025 Design, Manufacture, testing, supply & commissioning of WAGON MOUNTED STRINGING VEHICLE FOR UN-ROLLING /RE-ROLLING OF CONTACT & CATENARY WIRE ON CENTRAL RAILWAY, as per specification no. No. MRVC.SPEC.M&P. STRINGING VEHICLE.2025, Sketch no. MRVC.Sk.M&P.SV.01
 
Document Available
MRVCPROJECT MRVC/W/225 29-09-2025 Construction of Earthwork, retaining wall, drain and toe wall between Dahisar to Bhayandar station (from Ch. 36900 to 43000), and Naigaon - Vasai Road Station (From Ch. 48000 To CH. 50600) in connection with proposed 5th & 6th Railway lines between Borivali-Virar Stations of Western Railway Under Mumbai Urban Transport Project (MUTP) - Phase - IIIA
 
Document Available
MRVCELECTRICALMRVC-W-EL-Lift-CR-2025 30-09-2025 The work of Design, Manufacturing, Supply, Multiple loading/ unloading, Installation, Testing, Commissioning of 17nos Elevators and maintenance during warranty period and CAMC for 5 years to be provided in service/staff quarters at different stations of Central Railway under Kalyan-Badlapur 3rd and 4th line work of MUTP-III
 

1 - 4  Of  (4)              



  साईट मैप | हमसे संपर्क करें | आरटीआई | अस्वीकरण | नियम एवं शर्तें | गोपनीयता नीति Valid CSS! Valid XHTML 1.0 Strict

� 2010  सभी अधिकार सुरक्षित

यह भारतीय रेल के पोर्टल, एक के लिए एक एकल खिड़की सूचना और सेवाओं के लिए उपयोग की जा रही विभिन्न भारतीय रेल संस्थाओं द्वारा प्रदान के उद्देश्य से विकसित की है. इस पोर्टल में सामग्री विभिन्न भारतीय रेल संस्थाओं और विभागों क्रिस, रेल मंत्रालय, भारत सरकार द्वारा बनाए रखा का एक सहयोगात्मक प्रयास का परिणाम है.